KRAVZIK

IATF 16949 · One Factory · Tooling to Production

Precision Metal Stamping & Injection Molding

One integrated factory — in-house tooling, stamping, molding and plating. From DFM in 24 hours to 500M+ parts a year, under IATF 16949.

Explore Services
Precision stamped and molded components by KRAVZIK
±0.005mm
Critical tolerance
500M+
Annual capacity
Cpk 1.67
Capability standard
24h
DFM response

How it works

From Drawing to Delivery

1

DFM Review

Send drawings or samples — engineering feedback within 24 hours, free.

2

Tooling

In-house die and mold making: progressive dies 4–6 weeks, molds 5–8 weeks.

3

First Article

PPAP Level 3 with control plans, MSA and capability studies before mass production.

4

Production

Stamping, molding, plating and assembly under one roof — 50k to 500M+ pcs/yr.

Ready to Manufacture With One Accountable Factory?

From in-house tooling to high-volume production — stamping, molding, plating and assembly under one IATF 16949 roof. Send your spec and volume, get a quote within 24 hours.